PACKAGES
PACKAGE 1
Package 1
- 1 -10 clients
- Veritas Backup Exec
- Entry Level 24 slot tape drive – Dell TL2000 LTO6/7
- 20 Tapes
- 3 day install (½ Planning + 2.5 Install)
PACKAGE 2
Package 2
- 10 – 15 clients
- Veritas Backup Exec
- 24 slot tape drive – Dell TL2000 – LTO6/7
- 30 Tapes supplied pre-labeled
- 3 day install (½ Planning + 2.5 Install)
PACKAGE 3 - NETBACKUP STARTER
Package 3 – Netbackup Starter
- 20 client ( 2 x Databases up to tier 2 )
- 1 Drive – 24 slot Automated Library – Dell TL2000 LT06/7
- Dedicated backup server supplied
- 40 Tapes supplied pre-labeled
- 4 day install ( 1 day planning + 4 install )
PACKAGE 4 - VERITAS E-VAULT AND FILE-STARTER
Package 4 -Veritas E-Vault and File-Starter
- 50 -100 E-mail Client + 1TB of File Data
- Dedicated archive server supplied – 3TB embedded SATA on server
- ½ day presales consultancy
- 3 day install ( 1/2 planning + 2.5 install )
- 2 day annual healthcheck +Maintenance
PACKAGE 5 – VERITAS E-VAULT AND FILE - MEDIUM ENTERPRISE
Package 5 – Veritas E-Vault and File – Medium Enterprise
- 100 -400 E-mail Client + 5TB of File Data
- Dedicated archive server supplied – 5 TB embedded SATA on server ( Dell R730 /DL380 G9 )
- ½ day presales consultation
- 4 day( 1 day Planning and 3 day install ) assuming client involvement in client rollout
- Optional : 3 day annual health check + maintenance
PACKAGE 6 - VERITAS E-VAULT AND FILE - ENTERPRISE
Package 6 -Veritas E-Vault and File – Mid enterprise
- 100 -400 E-mail Client + 5TB of File Data
- Dedicated archive server supplied – 5 TB embedded SATA on server ( Dell R730 /DL380 G9 )
- ½ day presales consultation
- 4 day( 1 day Planning and 3 day install ) assuming client involvement in client rollout
- Optional: 3 day annual health check + maintenance
PACKAGE 7 - VERITAS E-VAULT AND FILE - HIGH CAPACITY STORAGE/ARCHIVE
Package 7 -Veritas E-Vault and File – High Capacity Storage/Archive
- 500 -2000 E-mail Client + 10 TB of File Data
- Dedicated file archive server supplied – 4TB embedded SATA on server ( Dell R730 /DL380 G9 )
- Dedicated email archive server supplied – 4TB embedded SATA on server ( Dell R730/DL380 G9 )
- ½ day presales consultation
- 6 day ( 1 planning + 5 install ) assuming client involvement in client rollout
- Optional: 4 day annual health check +maintenance
Notes
Pre-Sales support will be offered (where required) on the larger installs – providing one meeting accompanying the sales person on-site included at no additional cost.
‘Bolt-on’ post installation support package may be offered – to draw down following installation period completion.
Precise ‘inclusions / exclusions’ list will be provided as an addendum to the offering.
Database agents are as specified in the Backup costs.
Operating System – Windows 2008 std server is included with all application servers.
Upgrades (as opposed to new installs) are excluded from these costs – and will be handled separately.